{"id":216,"date":"2015-04-29T15:50:00","date_gmt":"2015-04-29T15:50:00","guid":{"rendered":"http:\/\/sheaterrace.com\/?p=216"},"modified":"2015-04-29T15:56:45","modified_gmt":"2015-04-29T15:56:45","slug":"constitution-water-and-sewer-rehab-newsletter%e2%80%8f","status":"publish","type":"post","link":"https:\/\/sheaterrace.com\/?p=216","title":{"rendered":"Constitution Water and Sewer Rehab Newsletter"},"content":{"rendered":"<div>The City of Portsmouth Department of Public Utilities will soon begin replacement of the existing water and sanitary sewer mains along a portion of Constitution Avenue from approximately North Street to Ann Street.\u00a0 In general, this work will be confined to excavation of the roadway for installation of the pipes, manholes, and various connections.\u00a0 Upon completion of the utility work, this portion of Constitution Avenue will be repaved.<\/p>\n<\/div>\n<div><\/div>\n<div>The project was awarded to Gaston Brothers with an anticipated mobilization at the beginning of May.\u00a0 The total construction time for this project is two months.\u00a0 Unfortunately, construction of this magnitude can be disruptive.\u00a0 However, the City and Gaston Brothers will work very hard to minimize disruptions.\u00a0 Construction activity will be limited to Monday through Friday from 7:30 am to 5:00 pm.\u00a0 However, there will be a maximum of three scheduled water service interruptions as the contractor replaces the water lines.\u00a0 This work will occur between the hours of midnight and 6 am and you will be notified in advance.<\/p>\n<\/div>\n<div><\/div>\n<div>Click the link below to see the attached PDF for information on entrance and exit plans for Shea Terrace traffic.<\/p>\n<\/div>\n<div><\/div>\n<div><a href=\"http:\/\/sheaterrace.com\/wp-content\/uploads\/2015\/04\/ConstitutionAveConstNewsletter1.pdf\">Constitution Avenue Construction Newsletter<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The City of Portsmouth Department of Public Utilities will soon begin replacement of the existing water and sanitary sewer mains along a portion of Constitution Avenue from approximately North Street to Ann Street.\u00a0 In general, this work will be confined &hellip; <a href=\"https:\/\/sheaterrace.com\/?p=216\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-216","post","type-post","status-publish","format-standard","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/posts\/216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=216"}],"version-history":[{"count":7,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/posts\/216\/revisions"}],"predecessor-version":[{"id":221,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=\/wp\/v2\/posts\/216\/revisions\/221"}],"wp:attachment":[{"href":"https:\/\/sheaterrace.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sheaterrace.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}